Products Using Existing Tooling
- Minimum order quantity
- 500 pieces
- Sample lead time
- 5β7 working days
- Production lead time
- 12β18 working days
Starts after sample approval
OEM and ODM enquiries can begin with a drawing sample reference or written brief with project scope reviewed against the confirmed manufacturing capabilities
Start a Custom ProjectThe two programmes use different minimum quantities and planning windows with final terms confirmed after the product requirements are reviewed
Starts after sample approval
Adjusted according to product structure and dimensions
Starts after sample approval
Unknown details can remain open and confidential information should only be included after an appropriate process has been agreed
Share a drawing sample reference product sketch or clear description of the part or product
Include known materials dimensions appearance surface treatment assembly and packaging needs
Add the estimated quantity destination target timing and whether new tooling is required
Custom project enquiry
Drawings material requirements quantities and target timing can be clarified in the enquiry
Loading privacy choices