Skip to content
SZKONGTAT

Start with the product requirement you have

OEM and ODM enquiries can begin with a drawing sample reference or written brief with project scope reviewed against the confirmed manufacturing capabilities

Start a Custom Project
  • 20+ Years ExperienceSince 2005
  • In-House Tooling & CNCPrecision mold design & manufacturing
  • Strict QA/QC StandardIQC, IPQC, OQC & 100% pre-shipment inspection

Existing tooling or a new custom mold

The two programmes use different minimum quantities and planning windows with final terms confirmed after the product requirements are reviewed

Route 01Existing product

Products Using Existing Tooling

Minimum order quantity
500 pieces
Sample lead time
5–7 working days
Production lead time
12–18 working days

Starts after sample approval

Route 02Custom project

New Tooling Custom Projects

Minimum order quantity
3,000–5,000 pieces

Adjusted according to product structure and dimensions

Tooling & First Article Sampling
25–35 working days
Production lead time
15–22 working days

Starts after sample approval

Useful information for the first review

Unknown details can remain open and confidential information should only be included after an appropriate process has been agreed

  1. 01

    Product reference

    Share a drawing sample reference product sketch or clear description of the part or product

  2. 02

    Technical requirements

    Include known materials dimensions appearance surface treatment assembly and packaging needs

  3. 03

    Commercial context

    Add the estimated quantity destination target timing and whether new tooling is required

Custom project enquiry

Share the project details you already have

Drawings material requirements quantities and target timing can be clarified in the enquiry

Loading privacy choices