Skip to content
SZKONGTAT

Start with the product requirement you have

OEM and ODM inquiries can begin with a drawing, sample, reference, or written brief, with project scope reviewed against confirmed manufacturing capabilities.

Start a Custom Project
  • 20+ Years ExperienceSince 2005
  • In-House Tooling & CNCPrecision mold design & manufacturing
  • Strict QA/QC StandardIncoming, in-process and pre-shipment checks agreed for the project

Existing tooling or a new custom mold

The two programs use different minimum quantities and planning windows, with final terms confirmed after the product requirements are reviewed.

Route 01Existing product

Products Using Existing Tooling

Minimum order quantity
500 pieces
Sample lead time
5–7 working days
Production lead time
12–18 working days

Starts after sample approval

Route 02Custom project

New Tooling Custom Projects

Minimum order quantity
3,000–5,000 pieces

Adjusted according to product structure and dimensions

Tooling & First Article Sampling
25–35 working days
Production lead time
15–22 working days

Starts after sample approval

Useful information for the first review

Remaining details can be confirmed during engineering review, and an NDA can be executed prior to sharing confidential drawings.

  1. 01

    Product reference

    Share a drawing, sample, reference product, sketch, or clear description of the part or product.

  2. 02

    Technical requirements

    Include known materials, dimensions, appearance, surface treatment, assembly, and packaging needs.

  3. 03

    Commercial context

    Add the estimated quantity, destination, target timing, and whether new tooling is required.

Custom project inquiry

Share the project details you already have

Drawings, material requirements, quantities, and target timing can be clarified in the inquiry.

Loading privacy choices

WhatsApp