Skip to content
SZKONGTAT

Define the quality requirements for your project

Share measurable acceptance criteria and documentation needs with the inquiry, with inspection scope and project requirements confirmed prior to production.

Add Project Requirements

Inquiry checklist

Make the acceptance standard clear

Provide the criteria that matter to the product, with unknown items remaining open for discussion rather than assumed.

  1. 01

    Drawings and tolerances

    Provide the current drawing revision, critical dimensions, tolerances, and any features that require particular attention.

  2. 02

    Material and finish

    State known material grades, colors, surface finishes, appearance limits, and restricted substance requirements when applicable.

  3. 03

    Acceptance criteria

    Share functional checks, test references, inspection points, defect limits, and sampling expectations that apply to the project.

  4. 04

    Required documentation

    List any inspection reports, material documents, compliance evidence, or other records that need to be reviewed for the inquiry.

Quality information

Confirm project quality requirements before production

Share any required certification, inspection equipment, test methods, or reporting requirements with the inquiry so the available scope can be reviewed for your product.

Loading privacy choices

WhatsApp